Crash probability: odds of a 10% drop

The range of probabilities the options market assigns to Bitcoin and Ether closing more than 10% lower at the next Friday expiry — read directly from put quotes.

As of 16 Nov 2026, 19:56 UTC, the risk-neutral probability of BTC closing below $58,560 (−10% from the $65,067 forward) at the 20 Nov 2026 expiry: between 1.1% and 7.5%; the single smooth-curve estimate is 4.3%; ETH closing below $1,640 (−10% from the $1,822 forward) at the 20 Nov 2026 expiry: between 2.0% and 13%; the single smooth-curve estimate is 6.8%.

BTC · below $58,560 by 20 Nov 202684 h left
1.1% – 7.5%
smooth-curve point 4.3%
2026-07-20band — corridor, line — smooth-curve point2026-11-16
ETH · below $1,640 by 20 Nov 202684 h left
2.0% – 13%
smooth-curve point 6.8%
2026-07-20band — corridor, line — smooth-curve point2026-11-16

A put price is the product of two things: how likely a drop is and how deep it would go. The market quotes the product, not the factors, so a finite set of bids and asks leaves a whole range of price distributions that agree with every quote at once. The corridor is the full range of the risk-neutral probability of closing more than 10% below the forward at the nearest Friday expiry that is consistent with all put bids and asks simultaneously (and robust to dropping any single quote). The smooth-curve point is the one fitted density inside that range. Risk-neutral probabilities are the price of insurance, not a forecast. JSON: crash_frontier.json.

BTC · last 21 daily readings

Day (UTC)Friday expiryCorridorSmooth-curve point
2026-11-162026-11-202.2% – 11%5.8%
2026-11-152026-11-200.9% – 16%11%
2026-11-142026-11-201.0% – 7.5%3.9%
2026-11-132026-11-20<0.1% – 13%5.4%
2026-11-122026-11-13<0.1% – 1.5%0.3%
2026-11-112026-11-13<0.1% – 3.8%1.2%
2026-11-102026-11-13<0.1% – 6.2%1.5%
2026-11-092026-11-13<0.1% – 9.8%3.3%
2026-11-082026-11-13<0.1% – 9.8%3.5%
2026-11-072026-11-13<0.1% – 10%4.0%
2026-11-062026-11-130.3% – 13%6.3%
2026-11-052026-11-06<0.1% – 0.7%<0.1%
2026-11-042026-11-06<0.1% – 4.2%1.8%
2026-11-032026-11-06<0.1% – 5.5%2.4%
2026-11-022026-11-060.5% – 6.5%3.1%
2026-11-012026-11-060.8% – 7.8%4.2%
2026-10-312026-11-061.3% – 11%5.1%
2026-10-302026-11-06<0.1% – 23%8.6%
2026-10-292026-10-30<0.1% – 0.5%<0.1%
2026-10-282026-10-30<0.1% – 1.6%1.0%
2026-10-272026-10-300.2% – 2.2%1.7%

ETH · last 21 daily readings

Day (UTC)Friday expiryCorridorSmooth-curve point
2026-11-162026-11-203.1% – 14%7.8%
2026-11-152026-11-20<0.1% – 38%12%
2026-11-142026-11-202.3% – 15%7.2%
2026-11-132026-11-200.4% – 18%8.4%
2026-11-122026-11-13<0.1% – 4.3%1.4%
2026-11-112026-11-13<0.1% – 9.8%2.9%
2026-11-102026-11-13<0.1% – 12%4.4%
2026-11-092026-11-130.2% – 18%7.0%
2026-11-082026-11-131.7% – 13%6.6%
2026-11-072026-11-131.7% – 16%7.3%
2026-11-062026-11-132.9% – 20%10%
2026-11-052026-11-06<0.1% – 1.9%0.6%
2026-11-042026-11-060.7% – 7.2%3.1%
2026-11-032026-11-061.2% – 9.8%4.3%
2026-11-022026-11-062.3% – 13%6.1%
2026-11-012026-11-062.7% – 16%7.5%
2026-10-312026-11-063.5% – 16%8.6%
2026-10-302026-11-060.5% – 31%13%
2026-10-292026-10-30<0.1% – 1.8%0.6%
2026-10-282026-10-300.5% – 4.6%2.0%
2026-10-272026-10-300.9% – 6.3%3.1%

Questions

Why a range and not a single number?

A put price is the product of how likely a drop is and how deep it would go. The market quotes the product, not the factors, so a finite set of bids and asks is consistent with a whole range of probabilities. The corridor is that full range; any single number is a choice of one curve inside it.

Is this the real probability of a crash?

No. It is a risk-neutral probability — the price of insurance. Buyers of protection pay a premium over the plain odds, so the number describes what the market charges, not how often such drops happen.

What is the smooth-curve point?

One fitted price distribution's estimate of the same probability. When it sits outside the corridor, the smooth curve disagrees with the quotes themselves, and the page says so.

Which date and level does it refer to?

The nearest Friday option expiry, 08:00 UTC, and a close more than 10% below the forward price for that expiry. The level in dollars is shown on each card.

Why does the corridor widen or narrow?

It follows the quotes: wide bid-ask spreads on puts, or few strikes near the level, leave more distributions consistent with the market, so the range is wider. It also resets when the nearest expiry rolls to the next Friday.

How often is this updated?

The slice is recomputed and the page rebuilt every hour. The JSON file holds the day-by-day history and is free to read and quote with a link back to maza.trade.

Related: Options data — gamma, walls, implied distribution · Expected volatility · Liquidation probability by leverage

Data is generated on a schedule from public market sources and shown as-is. Research product, not investment advice. 18+

Explained simply
Add another block to the picture

Written by an AI model that reads only the figures this site publishes. It describes the data: no advice, no forecasts, and it can be wrong — check the number on the page. Ask a follow-up →